<var id="7xo83"><track id="7xo83"></track></var>
<u id="7xo83"><wbr id="7xo83"></wbr></u>
<acronym id="7xo83"></acronym>
  • <tt id="7xo83"></tt>
  • <blockquote id="7xo83"></blockquote>
  • <p id="7xo83"></p>
  • <b id="7xo83"><wbr id="7xo83"><input id="7xo83"></input></wbr></b>

        Contact us


        TEL:022-24832616
        FAX:022-24982771
        PHONE:13820942008
        MALI:tjbobeijd@163.com
        ADDRESS:Dongli Economic Development Zone, Tianjin, 11 weft Road, No. four, Fortune Plaza, A, block B, floor 29, No. 8

      您當前的位置:Home >> News Center >> Company >> Browse

      How can the pipeline installation be used in the p

      Time:2017-06-13  Author:  Hit:2165

      The installation of piping is very extensive. Pipes are used as storage and transportation containers, reaction containers, heat exchanger and other containers. The pipeline plays a very important role in petroleum, chemical industry, energy industry, scientific research and military industry. Compared with other modes of transportation, pipeline transportation has the advantages of large transport capacity, long sustainable time and long transportation distance. Pipeline transportation is the best choice if energy sources such as oil and gas are to be shipped. For example, our country of the west east gas pipeline and has recently been in the implementation of the policy in a way along the pipeline transportation has played a very important role.
      Pipes are made up of simplified, flanges, sealing elements, heads, nozzles, openings and supports. Some people will worry that the initial investment in pipe installation is relatively large. In fact, if you compare it, you will be able to understand. The greatest advantage of pipeline transportation is its high safety. As a result of transportation, the transportation process is separated from the external environment in comparison with other modes of transportation. Without the impact of external environmental factors, the safety of pipeline transportation has been greatly guaranteed.
      In the long run, the cost of piping installation is not too high. In general, the completion of a pipeline. Its use time is in 30 years or so. Pipeline transportation, the cost of its initial investment can be basically in the later use of the collection back.

      超喷在线视频97_久久久久综合久久久久_久久国产亚洲视频_无码专区亚洲Av无码

      <var id="7xo83"><track id="7xo83"></track></var>
      <u id="7xo83"><wbr id="7xo83"></wbr></u>
      <acronym id="7xo83"></acronym>
    1. <tt id="7xo83"></tt>
    2. <blockquote id="7xo83"></blockquote>
    3. <p id="7xo83"></p>
    4. <b id="7xo83"><wbr id="7xo83"><input id="7xo83"></input></wbr></b>